Master/living and kitchen Airhandlers Checked and tightened all electrical connections Heat strips were functional and within manufacture range UV system in kitchen Airhandler is out and needs replacement, UV system in master/ living is on but past date of replacement Changed customer provided filters Drains have slight build up in traps Blower motors and wheels where acceptable Evaporator coils were acceptable Both Airhandlers have biological growth build up Master/living and kitchen Heatpumps Checked and and tightened all electrical connections Dual run capacitors were within manufacture range Primary electrical units were acceptable Defrost boards were acceptable Defrosts were functional Refrigerant levels were acceptable at this time Fan blades and motors were acceptable Condenser coils were acceptable Washed condenser coils from the inside out Recommended drain cleanings, compressor saver for master/living Heatpump. And either uv upgrades or lamp replacements