Existing ejector pump non-functional. Cut the drywall to access the pit, and pump. Remove the lid, ball & check valve, and the pump, as well as clean the surrounding area. Install new ejector pump, ball & check valve, and lid connecting back to the existing discharge. Fill basin and run the pump multiple times to test.