We installed water clamps and ground wire to bond hot and cold water lines at the water heater as per inspection report. As a courtesy we also installed a bonding jumper at the prv. This was not on the inspection report, but is necessary for a complete grounding system. We installed a junction box in the walk in attic by the furnace to correct the flying splice. We secured the box, stapled the wires, spliced wires inside junction box, and installed a cover plate for the junction box.