Homeowners garbage disposal was jammed and the upstairs master bathroom toilet needed repairs to install the bidet. Unjammed the garbage disposal and tested and everything is working properly. Removed the toilet fill valve and tower. Removed the supply line and installed a new fill valve and supply line. Installed the bidet tee and connected lines and tested. Installed new tower part. Everything is working properly at this time. Left estimates for whole home water filtration.