Added a 10" return flex duct to basement system. Tied into existing return plenum and verified air flow to York system. Removed leaking section of 3/4 gas pipe and shut off. Made new hard pipe connections and performed leak check on new hard pipe, no leaks detected. System is fully operational at time of service.