For this job we will need to. Install a new sub panel to open some circuits. Move some circuits to open up for sub panel breaker. Run a 20 amp dedicated circuit for the pump. From the sub panel, run conduit, to the outside connection point. Replace and properly install outside weatherproof boxes at the house and pump. Install surge protection. Install gfi protection for outside plug box.