Complete the follow work below: Correct the issues inside the main panel and sub-panels by moving breakers to the correct locations and install UL approved types. Install a full home surge protection inside the main panel and at the sub-panel in the garage From the main panel inside install a new 6/3 NM-B cable to outside of the home for the de attached garage. Install a weatherproof junction box and convent to an outdoor rated wire. Have a directional bore team come out and install a new conduit underground from the home to the left side of the garage. Install a new 60 amp Nema 3 disconnect on the left side of the garage Install a new grounding system per code Install a #6 wire for the car charger and install a new 40 amp 240 v breaker and commission the unit for 30 amps. Replace failing breaker