This estimate is to remove the existing box and move it to a line at the center of the table. After removing the old box and line, we will install a new 4 inch box that will be rated to have a medium to large chandelier. In addition, this also includes running a new receptacle off of the existing receptacle in the bathroom upstairs for a soon to be installed bidet. After approval of the work to be done, I went to grab necessary material from the local supply house. They did not have the necessary breakers so I ordered them from our warehouse. After returning, I started work in the dining room area by removing the existing box. After removing and inspecting with a camera, I found that there would need to be sheet rock damage to finish the estimate as described to the customer previously. After agreeing, I covered all of the working area in plastic sheeting. I continued by cutting the necessary sheet rock, then drilling holes into the wood so that the wire could be routed appropriately.