We fixed and covered all of the lay in lights in the basement, we also re ran the switch legs for both fans in the basement and covered their junction boxes. We installed a connector on the 6-3 wire that was entering the panel. We separated all neutrals in the panel. We also installed a new plate on the gfci and switch in the mechanical closet.