This job was performed and completed over the course of several days due to scheduling, material complications, as well as weather complications. The start of the job proceeded with the arrival of the boring team. we proceeded in confirming and starting the bore. Due to the large amount of rock in this area, we were able to get most of the board to proper depth, but we’re short on both ending points of the run for being deep enough. It was not able to be hand dug due to the amount of rocks, so the solution of having poured concrete to proper depth required by the NEC will be our route for success. 5/4 At the next arrival point, the electrical system was finalized with all equipment, panels, and devices being mounted and installed. The system was tested for any fault or issues, and the install went perfectly. In addition, I plugged in the data system at the request of the data technician and ensure that the system was on. 5/8 Concrete was delivered and poured at a width of 16 inches and