Returned on site, Wednesday July 9th to complete work that was signed for. Today we rebuilt the upstairs hallway bathroom three handle tub/shower, installed a vanity along with hooking up the water and drains, replaced the master bathroom shower valve with a customer supplied single handle American standard valve (no warranty due to being cs) as well as installing a prv and a washing machine box. All work is done and water is back on with no leaks.