Arrived cycled power off and recovered refrigerant. Opened lines and removed air handler cabinet. Installed new air handler cabinet. Sealed with mastic tape and mastic. Added in-line safety and wet switch. Installed new filter dryer. Nitro brazed. Pressure test. Vacuumed lines. Charge system with 9 pounds of 410 a. Checked amperage and pressures. All is operating.