Conducted thorough assessment of basement plumbing infrastructure, documenting water supply system components including PVC piping configuration with multiple joints and fittings. Evaluated condition of T-junction pipe assembly and rubber coupling with metal band clamps securing vertical drainage sections. Verified integrity of all connection points and mounting hardware where pipes are secured to concrete wall structure.