For this job we installed 21 wafer lights throughout the offices and the kennels of the boarding facility. We also installed new switches and added a quad outlet on a dedicated circuit with a GFCI breaker in the main panel. We also installed a new outdoor flood light above the side door out to the dog walking area as a courtesy. We also repurposed the AC wire and installed a new disconnect above the ceiling on a walking platform where the future AC system will be. I also separated the grounds and neutrals in the sub panel and bonded the ground bar to the panel as a courtesy as well. We will be back to complete the other half of the facility once the ceiling is finished.