Rebuild 1.5” pvc drains under double bowl sink with proper fittings and connections. Also replace the 1/2” CPVC pipes that transition from copper to kitchen faucet with copper and quarter turn stop valves. Replace the 1/2” CPVC hose bibbs shut off valve with a brass ball valve and replace hose bibbs since it’s piped in CPVC.