For the master bathroom we completed a full re-wire to include: Installed a new 15 amp circuit for the master bathroom. We removed the recess lighting in the basement and fished a new wire across the ceiling and up into the master walk in closet. In the master closet we installed a new cut in box with a blank plate in order to get the new circuit up. We went into the walk in closet switch box and jumped out to the smaller closet, then to the toilet area and then to the 3g switch box. We also installed a new power supply to the smoke detectors in the hallway. We supplied and installed new boxes, switches plates annd one outlet in the walk in closet. With the new switch legs we provided and installed (7) new wafer lighting and (2) bath fans we wired in all new switch legs to each new fixture that we supplied. After installing and wiring everything up we restored power and tested everything to ensure it’s working. We made sure to clean our mess up to the homeowners satisfaction.