Today we installed a customer supplied specialty toilet in the first floor master bathroom. The existing toilet was carefully removed and properly disposed of. We also replaced the existing toilet supply stop and installed. The customer supplied toilet supply line. After installation, the toilet was flushed multiple times and all connections were thoroughly inspected to ensure there are no leaks. At this time, the toilet is operating properly and functioning as designed.