For this job, the customer had what looked like a slab leak in the master closet. After investigation we found the leak in a wall in the master closet. We cut out leaking section of pipe. The leak was a pin hole leak on the copper cpvc to pex fitting. Once we replaced section of pipe work, we let the glue dry, tested everything, and cleaned up. Thank you for choosing TE Certified.