Replace all cast-iron drain pipes for two bathrooms one kitchen and one washing machine. Will need to remove b-board paneling in master bathroom to access cast-iron drains inside of wall for both bathrooms. TE Certified does not repair drywall or paneling. Also remove section of drywall for washing machine drain to be replaced. Provide and install a Kohler Highline comfort height elongated toilet in biscuit color in master bathroom. Replace drains all the way to exterior wall. Will have our underground department come out to replace the piece of cast iron underground.