This price is for upgrading the meter to a 300 amp service, This includes a new weatherhead, mast, eyebolt, pipe to the main meter. It also includes replacing all of your breakers with arc fault breakers as is require required by code as well as a surge protector on each panel. Thank you for using TE certified electrical! Veaya