Upon arrival spoke with customer about a leak at a copper to cpvc transition fitting. Gave customer options. Meter was located, piping was disassembled, new Prv & hose bib was installed, all piping was reconnected, water was turned back on and air was bled from the system. Water heater was turned back on and verified to be functioning. All work was tested and no leaks were observed.