Returned to upsize the gas line supplying the tankless water heater from ¾" to 1". The final 20 feet of gas line will remain ¾" at this time. The gas meter will need to be increased in capacity to accommodate the required gas volume. Once the meter upgrade is completed, the inspection will need to be rescheduled and performed again.