Excavated area at meter. Found that a fitting separated from the main and that there was a split in the irrigation main. These were the cause of the leaks. Reconnected irrigation to the main. Installed a DCBA to meet current safety standards. Repiped as needed. Tested for leaks, all good. Covered area with a new valve box. Backfilled to grade. Thank you for choosing T.E. Certified.