As we arrived back here today, Tuesday, December 23, we’ve come back to fulfill the estimate of roughing in the new kitchen area. We installed seven new dedicated circuits for the kitchen area. We pulled wire through a chase in the basement above the electrical panel all the way across the basement floor up into the areas where we installed new receptacles. We installed six 120 V dedicated circuits. One for the microwave, dishwasher, refrigerator, disposal and two separate countertop circuits. Installed one 240 V circuit for the oven. We mainly used the holes that are opened up by the plumbers to pull all of our wires through. We did have to cut a few holes in the sheet rock ourselves. We also installed a new switch leg and wiring for countertop lights, which will be installed under the cabinets once they are put in. From that switch leg, we installed a three-way switch at both entryway doors so you could turn the undercabinet lights on at either location. We also installed a new rece