Upon arrival I was pointed to the pot filler which needed to be installed. Previously a waterline was run and a drop eard L was installed inside of the wall. A ball valve necessary for the isolation of the pot filler was required. Upon approval, we installed the ball valve and installed the pot filler. Tested everything for leaks and proper function.