Excavate area in front yard marked with white flags where separation is located and new 6” clean out will be installed down to expose existing piping. Remove defective section approximately 15’ and install new 4” sch 40 pvc, connect back to existing pvc, and extend towards street with new 6” pvc clean out at tap. Test for operation and cover area back to grade. Customer would like us to salvage any grass if possible to put back in place. The water line crosses the sewer up near the water meter and I told customer if we need to remove a section of the water service to perform work, we will include this in the scope of work depending on the age and piping material. If we need to replace a bigger section or the whole water service, this will change the price and scope of work. LIFETIME WORKMANSHIP WARRANTY ON REPAIRS MADE BY TE CERTIFIED