400a service upgrade with new 200a (42 space) panel that will be a non-backed up loads panel, and transfer large circuits to non-backed up loads panel. -Complete grounding system -New charger circuit directly to gateway -Transfer high amperage circuits to new non-backed up panel. -Install gateway, and run new 60a circuit to new charger