Completed Annual Fire Alarm inspection for 2020
Completed Annual Fire Extinguisher inspection for 2020
Completed Annual Smoke Alarm inspection for 2020
Installed 1-5 lb ABC Clean Agent Extinguisher in Room B105 DATA TECH/HEAD END ROOM and Updated 2019 Report
Completed annual Fire Alarm inspection for 2020 Also Replaced FACP Batteries approved by Michelle
Arrived On-Site FACP Clear and Normal. Checked Wiring and proper End of line Resistance (47K ohms) upon completing tug test on wiring connections. NAC circuit 1 pulled straight out of terminal. Re-fastened Wiring and continued to trouble shoot, found dish washing station Horn/Strobe was water damaged from hot steam and strobe behind small hood had excessive grease buildup on unit. Replaced both units and checked for proper resistance loops are both showing 46 k ohms end of line resistance. Reset System. ***All Systems Normal and Reset ***
Completed annual Fire Extinguisher inspection for 2019
Semi-Annual Inspection of Kitchen Suppression System Annual Fire Extinguisher Inspection