2710 Northridge Dr. Suite #F
Grand Rapids, MI 49544
1-800-968-2871

Our Top Cities


Job Locations
for detroit, mi


Map of Detroit MI
Terrence  J.

Terrence J.


Job Checkin

6/2/23 Sent Rick an email regarding the inspection. DH 5/22/23MV Emailed Tony regarding inspection date 5/31 Sprinkler Inspection Annual Sprinkler Inspection Deficiency: System is due for five-year internal obstruction investigation Deficiency: Sprinkler system is due for five-year gauge change. 1- gauge Deficiency: Main drain valve handle must be replaced it is broken. One valve handle for 2 inch angle valve Deficiency: Sprinkler system is due for five year internal check valve inspection and fire department connection Deficiency: Sprinkler system is due for Hydro test on fire department connection Deficiency: Dry pending heads are due for testing. Three 155° chrome pendant 12 inch in length standard response dry pendant sprinkler heads.