Trouble on NAC 3 is coming from a bad wire in between the horn strobe in room 120 and the horn strobe in room 119. Both rooms have a hard ceiling. To run a new wire we will need to make holes in the drywall and run wire across and then make drywall repairs. Each room is about 20'-25' to the hallway. Will need glow rods, and about 75’ of 14/2. *EOL is currently at the hornstrobe in rm 120 bedroom to keep the system from going in and out of trouble. Be sure to give notice to customer before we return for repairs so they can make sure rooms are vacant. - repair This quote is for 2 guys 1 day to get wire ran and fix the horn strobe circuit. Technician is to put an X on wall with pencil and have the facility cut opening wall locations and patch openings when wire run is completed .