51 Koweba Lane
Indianapolis, IN 46201
(855) 932-6437

Our Top Cities


Job Locations
for mishawaka, in


Map of Mishawaka IN
Paul H.

Paul H.


Job Checkin

12yr Hydrostatic Test Past Due: (Non-Compliant) Ansul 3-Gallon System (2006 Manufacture Date) During your most recent Fire Protection Inspection, our technicians noted that one or more of your Fire Suppression Tanks are due for a hydrostatic test per: NFPA 17A: 7.5.1 The following parts of wet chemical extinguishing systems shall be subjected to hydrostatic pressure testing at intervals not exceeding 12 years: Wet Chemical Containers Auxiliary Pressure Containers Hose Assemblies Fire Suppression Tanks are required to be pressure tested using water or some other non-compressible fluid to help prevent unwanted failure or rupture of the cylinder.  NFPA 17A also requires the replacement of the cartridge used to expel suppression chemical hoses, o-rings, and burst discs. Aluminum Scissor Linkage Deficiency: Ansul Stainless Steel Link Holders Needed During the inspection of the Ansul fire suppression system, the technician noted that the existing aluminum link holders do not meet the requi