11/20/25 For this call I performed rec work. I discovered a clogged primary and secondary drain line. Secondary line was loose in the attic. Rec work scheduled for Monday to return and reconstruct the whole secondary line. Ryan s- ran new secondary drainline to patio, previous secondary was loose in attic and capped.