Joe to send install crew tomorrow Replacing supply plenum (smaller than coil to prevent water from getting into it again) - three 10” three 9” and an 8” Replace section of 10” duct that has water in it Bring drain lines to code with drain switch on primary and wet switch in the secondary pan Clear drain line on other system