Arrived to performed scheduled wreck work. pumped down system and replaced 074 with 061 piston, pulled vacuum to 500 microns and released pumped down, adjusted refrigerant levels to 20 degrees superheat and 19 degree delta T, may need to return on a warmer day to further adjust refrigerant levels, performed function check cooling and heating and system is functioning normally at time of departure.