2020 Goodman Gas Furnace Checked and tightened all electrical connections Drain was clear and draining at this time Ignition system is functional Al safeties are functional at this time Filter is in need of changing customer did not have one at this time Blower Motor and wheel were acceptable Evaporator coil was acceptable Supply plenum has biological growth build up 2020 Goodman Straight Cool Checked and tightened all electrical connections Dual run cap was within manufacture range Primary electrical unit was acceptable Refrigerant levels are slightly off due to the filter being COMPACTED Fan blades and motor were acceptable Condenser coils were acceptable Cleared debris from the bottom of the unit Washed condenser coils from the inside out Waxed the top of the unit Recommended Micro Air Soft start kit, UV 200 for biological growth and promote clean air as well as unit surge protection Customer agreed to install UV 200