Performed super tune up Washed condensor and tightened connections All cooling and heating components are in tolerance Delta 18 Work to be scheduled - drain clear - not adequate fast drainage - drain pan treatment/microbial - 25 Amp breaker - April air media filter 310 Parts have been verified to be at shop Work to be scheduled tomorrow 4/29/25 as first call after meeting System left on cool at exit