New home runs from attic sub panel to each of the three separate air handlers in attic. Installed new disconnects. Blanked off all existing j boxes. On arrival customer stated they were no longer interested in installing 3 in line disconnects in hallway. Adjusted invoice accordingly. Replaced single pole 30 amp breaker with appropriate 20 amp breaker in main sub panel feeding the majority of second floor loads. Job complete. All units running. Repaired low voltage landscape lighting wire.