Performed evaluation Primary Drain line is backed up Medium build up in trap and sink trap Main clog was in line between system and sink Performed full clear Installed drain saftey switch on primary line and updated trap/ventilation Installed microbial treatment strip under coil Tested system and passed water test System performing with 18 Delta System left on cool at exit