Arrived for evaluation At arrival system was down Transformer failed to send 24 - replaced transformer and added 3AMP fuse System tested with fuse reset and found primary electrical control unit measured at .2 - replaced the electrical unit for heat strips Second primary electrical control unit for heat strips replaced to high possible failure Stripped and installed new connection points due to original breaking when adjusting tightenes Original filter had not been replaced since last visit - current filter replaced on this visit Reccomended compressor saver kit Reccomended soft start kit Reccomended whole home surge protection Electrical service scheduled for electrical panel inspection and home electrical inspection on 12/16/24 9am-5pm System left on 70 heat at exit